QW-322 · D1.1:2025 Clause 6.2.3 · Qualification MaintenanceWelder Continuity Log: QW-322 and D1.1 Clause 6.2.3
A welder continuity log tracks when each welder last used each qualified welding process. ASME IX QW-322 and D1.1 Clause 6.2.3.1 tie qualification to recent use; under D1.1 it lapses after a period exceeding six months. This guide covers what to record and how to track it.
The 6-Month Rule
The core requirement is straightforward: a welder must use each qualified welding process before the governing code’s inactivity period runs out (under D1.1, a period exceeding six months). If that period passes without the welder welding with a specific process, that process qualification lapses.
ASME IX QW-322.1 (BPVC.IX-2025) states: “The qualification of a welder or welding operator for a process remains valid provided no more than 6 months have passed since the welder or welding operator last used that process.” The rule applies independently to each process — a welder qualified for three processes must use all three within each 6-month window.
D1.1:2025 Clause 6.2.3.1 contains a parallel requirement: a welder’s qualification remains in effect indefinitely unless the welder is not engaged in a given process of welding for which the welder is qualified for a period exceeding six months. When that period of effectiveness has lapsed, Clause 6.25.1.3 requires a requalification test.
The practical consequence: a fabrication shop with 20 welders, each qualified for 2-3 processes, must track 40-60 individual process/welder combinations. Without a systematic tracking tool, lapsed qualifications are inevitable — and discovering them during a third-party audit is a costly compliance failure.
What to Record in the Continuity Log
Neither code prescribes a specific format, but the log must provide enough information for an inspector to verify that each qualification is current. The industry-standard fields include:
| Field | Purpose | Example |
|---|---|---|
| Welder ID | Unique identifier (stencil number or name) | W-042 |
| Process | Welding process per qualification | SMAW, GMAW, FCAW |
| Qualification date | Date of original or most recent qualification test | 2025-09-15 |
| Last use date | Most recent production welding with this process | 2026-03-10 |
| Expiry / review date | Six months from last use (auto-calculated review date); under D1.1 the qualification itself lapses only after a period exceeding six months | 2026-09-10 |
| Job/WO reference | Traceability to the production work | WO-2026-0847 |
| Status | Current / Expiring Soon / Lapsed | Current |
Setting Up an Effective Tracking System
Spreadsheet Approach
The simplest method: a shared spreadsheet with one row per welder/process combination. Add conditional formatting to highlight rows where the expiry date is within 30 days (yellow) or past due (red). Update the “last use date” column whenever a welder performs production welding. This works for shops with up to ~30 welders. Beyond that, the manual update burden becomes error-prone.
Database or ERP Integration
Larger fabrication shops integrate continuity tracking into their ERP or quality management system. When a welder logs time against a work order that specifies a welding process, the continuity log updates automatically. This eliminates manual entry errors and provides real-time visibility into which qualifications are approaching their 6-month window.
Alert System
Regardless of the tool, set up automated alerts at two thresholds: 60 days before expiry (warning — schedule the welder for work using that process) and 30 days before expiry (urgent — if no production work is available, consider a maintenance weld or requalification test). Discovering a lapsed qualification after the fact is always more expensive than preventing it.
What Happens When a Qualification Lapses
When the governing code’s inactivity period passes without process use (under D1.1, a period exceeding six months), that qualification is no longer valid. The welder must:
- Stop performing production welding with the lapsed process immediately
- Schedule and pass a new qualification test for that process
- Have the new qualification documented on a new WPQ (Welder Performance Qualification) record
- Update the continuity log with the new qualification date
Any production welding performed with a lapsed qualification is a code violation. Time is not the only limit. Under D1.1 Clause 6.2.3.1, a welder’s qualification remains in effect indefinitely unless the welder is not engaged in the qualified process for a period exceeding six months, or “there is some specific reason to question a welder’s or welding operator’s ability (see 6.25.1).” Clause 6.25.1 sets the retest requirements, including a complete retest of the types and positions failed or in question after further training or practice (6.25.1.2), a requalification test after the period of effectiveness has lapsed (6.25.1.3), and no immediate retest after failure of a requalification retest (6.25.1.4).
Under ASME IX, production welds made by a welder with a lapsed qualification may need to be evaluated on a case-by-case basis by the Authorized Inspector. If the welds were made after the qualification lapsed but before the lapse was discovered, the welds may need to be cut out and re-welded, or the welder may need to requalify and the welds re-evaluated — depending on the Authorized Inspector’s judgment and the construction code requirements.
Audit and Inspection Requirements
The continuity log is one of the first documents requested during quality audits. Here is what each type of audit typically reviews:
AISC certification audits (for D1.1 shops): The auditor verifies that every welder currently assigned to production welding has a valid qualification for each process they are using. The continuity log must show unbroken 6-month windows for every active process. Gaps in the log are audit findings.
ASME Authorized Inspector reviews: The AI verifies welder qualifications as part of the quality system review required by ASME Section I, VIII, or the applicable construction code. The continuity log must be reconciled with production records — if the log shows a welder used SMAW in January, there should be a corresponding production record showing SMAW work performed by that welder in January.
Third-party QA audits: Client or third-party QA representatives frequently request the continuity log during shop visits. They may cross-reference the log against the shop’s WPS list to verify that every WPS in active use has qualified welders with current continuity for the specified process.
Need help with qualification tracking?
Ask Flux about continuity rules, process-specific requirements, or qualification ranges.
Ask FluxReference tool only. Verify continuity records against the applicable code edition, project specifications, and employer qualification records before accepting production welding.
Key Takeaways
- The 6-month rule is per process, not per welder. Each qualified process must be used independently within its own 6-month window.
- Neither code prescribes a log format — the continuity log is the industry-standard way to show that each qualification is still in effect.
- Prevention is cheaper than correction. Set up 60-day and 30-day alerts. A requalification test costs $200-500; discovering lapsed qualifications during an audit can halt production.
- Tie log updates to production records for traceability. An inspector should be able to trace from the log entry to the work order to the welder’s stencil on the weld.
"Records of the test results shall be kept by the manufacturer or Contractor and shall be made available to those authorized to examine them."
D1.1:2025 Clause 6.3.3
Frequently Asked Questions
A welder continuity log is a tracking document that records when each welder last used each of their qualified welding processes. ASME IX QW-322 and D1.1 Clause 6.2.3.1 both end a process qualification after a period without that process; under D1.1 it lapses when the welder is not engaged in the process for a period exceeding six months. The continuity log provides the documented evidence that this requirement is met. Without it, an auditor or inspector has no way to verify that a welder's qualifications are current. Most fabrication shops maintain the log as a spreadsheet or database entry per welder, updated each time the welder performs production welding with a qualified process.
When a welder has not used a qualified process for the governing code's period (under D1.1, a period exceeding six months), that specific process qualification lapses. The welder cannot perform production welding with that process until they requalify by producing a new test coupon and passing the applicable acceptance tests. Other process qualifications that have been maintained are not affected — only the lapsed process requires requalification. Under D1.1 Clause 6.2.3.1, the qualification remains in effect indefinitely unless the welder is not engaged in the process for a period exceeding six months, or there is some specific reason to question the welder's ability (see 6.25.1). Clause 6.25.1.3 requires a requalification test after a lapse; after further training or practice, Clause 6.25.1.2 requires a complete retest of the types and positions failed or in question.
The continuity log should be updated each time a welder performs production welding with a qualified process. In practice, most shops update the log weekly or at least monthly. The critical requirement is that the log must show evidence of process use within the most recent 6-month window at any time an inspector requests it. Shops that update the log only when audits are scheduled risk having gaps that cannot be filled retroactively. A best practice is to tie the log update to the daily production record or timesheet — when the welder clocks welding hours on a job, the continuity log entry is created simultaneously.
The 6-month rule applies per process. A welder qualified for SMAW, GMAW, and FCAW must keep using each of those three processes to maintain all three qualifications. Using GMAW every day does not maintain the SMAW qualification. If the welder does not perform any SMAW welding for the governing code's period (under D1.1, a period exceeding six months), only the SMAW qualification lapses — the GMAW and FCAW qualifications remain valid as long as they have been used. This is why the continuity log must track each process separately for each welder.
Neither ASME IX nor D1.1 prescribes a specific log format or explicitly requires a document called a continuity log. D1.1 Clause 6.3.3 requires the manufacturer or Contractor to keep records of the test results and make them available to those authorized to examine them. Under ASME BPVC.IX-2025 QW-322.1, a qualification for a process remains valid provided no more than 6 months have passed since the welder last used that process. Under D1.1 Clause 6.2.3.1, the qualification lapses when the welder is not engaged in the process for a period exceeding six months. The continuity log is the industry-standard method for showing that each qualification is still in effect. During AISC certification audits, ASME authorized inspector visits, and third-party QA reviews, the continuity log is one of the first documents requested.
Reference data from ASME BPVC IX:2025 and AWS D1.1/D1.1M:2025. Not affiliated with ASME or AWS.