V-開先溶接 Symbol
How to read a V-groove 溶接記号 — 開先角度, root opening, single-V vs double-V. D1.1:2025 事前認定 CJP details for the most common groove 溶接の種類.
Prequalified V-Groove CJP Details
D1.1:2025 Figure 5.1 (Type 2) specifies prequalified single-V-groove CJP butt joints. These are the most commonly used groove weld configurations in 構造用鋼.
| Process | Designation | Root Opening | Groove Angle | Positions |
|---|---|---|---|---|
| SMAW | B-U2a | 1/4" | 45° | All |
| SMAW | B-U2a | 3/8" | 30° | F, V, OH |
| SMAW | B-U2a | 1/2" | 20° | F, V, OH |
| GMAW/FCAW | B-U2a-GF | 3/16" | 30° | F, V, OH |
| SAW | B-L2a-S | 1/4" | 30° | F only |
How to Read V-Groove Dimensions
The V-groove symbol follows the 規格 groove dimension rules from A2.4 §7. All dimensions go on the same side of the 基線 as the V symbol.
Root opening (R) goes inside the V — between the two legs. This is the gap between the members before 溶接. Per D1.1 Figure 5.1, fit-up tolerance is +1/4", −1/16" from the specified root opening.
Groove angle (α) goes above or below the weld symbol as appropriate per A2.4 §7.3.2. This is the total 含み角 of the prepared groove.
Groove depth (D) goes to the left without parentheses — only for PJP. For CJP, D is omitted.
Weld サイズ (S) goes to the left in parentheses — only for PJP. The parentheses distinguish it from groove depth. For CJP, both D and (S) are omitted.
Single-V vs Double-V
Single-V: V symbol on one side of the reference line only. The joint is prepared from one side. Used for most structural butt joints.
Double-V (X-groove): V symbols on both sides of the reference line. The joint is welded from both sides. Used on thick plate (>1") to reduce 溶接金属 volume and balance 溶接ひずみ. Per A2.4, the V-groove is a symmetric symbol, so axes align directly across the reference line.