AWS A2.4 Section 13.1 · Flanged JointsEdge Weld Symbol
The edge 溶接記号 appears in AWS A2.4 Figure 4.1 and is defined for parallel and flanged joints by AWS A2.4 Section 13.1. When CJP is required on flanged joints, AWS A2.4 Section 13.4 combines it with melt-through on shop drawings.
How to read an へり溶接 (エッジ溶接) symbol — the two parallel lines indicating a weld joining flanged or parallel edges. Common in sheet metal, less common in 構造用鋼. When to combine with melt-through.
Edge Weld Symbol Dimensions
Per AWS A2.4 Section 13.1, the edge weld symbol is two short parallel vertical lines on the 基線. It represents a weld that fuses the full 板厚 of both member edges.
Use this symbol only when the joint really is an edge-weld condition: parallel edges, a flanged 突合せ継手, or a flanged 角継手. If the drawing is calling for prepared butt-継手形状, a square groove or another groove weld symbol is usually the cleaner AWS A2.4 reference. The edge weld symbol should not be used as a generic shortcut for every two-line joint symbol.
Where Each Dimension Goes
Size — to the LEFT when specified. This is the weld width or buildup thickness.
Length — to the RIGHT. The extent of the edge weld along the joint.
Joint Types
Parallel edge joint — two members with edges aligned side by side. The weld fuses the edges together.
Flanged butt joint — thin members with edges flanged (bent) to create a preparation for 溶接 from one side.
Flanged corner joint — one or both members flanged at a corner. The flange creates material for the weld.
Combining with Melt-Through
When CJP is required on a flanged joint welded from one side, add the melt-through symbol (filled semicircle) on the opposite side of the reference line per AWS A2.4 Section 13.4. This combination tells the 溶接士 that full penetration with visible 裏波 (ルート補強) is required.
The melt-through symbol is the important quality cue. Without it, the edge weld symbol identifies the joint and 溶接の種類, but it does not by itself prove complete 溶込み (継手溶込み). When 検査 requires back-side evidence, make the melt-through requirement explicit and 確認 the finished root condition against the governing drawing or procedure before accepting production welds at closeout and final documentation review.